Применение:Water Transfer & Hydropower Projects

Continuous lining for a long-distance water conveyance channel.

A long water-transfer channel required consistent concrete quality over an extended alignment. A matched placing, finishing and jointing equipment set was delivered.

Continuous operation reduced joint defects and kept output steady across shifting work fronts.

Данные проекта публикуются с согласия заказчика.

Обсудить похожий проект