Continuous lining for a long-distance water conveyance channel.
A long water-transfer channel required consistent concrete quality over an extended alignment. A matched placing, finishing and jointing equipment set was delivered.
Continuous operation reduced joint defects and kept output steady across shifting work fronts.
Project details are published with client authorization.