International equipment purchases usually fail on logistics details rather than on machine capability. Before signing, confirm these four items.
1. Shipping configuration. Establish what ships assembled, what breaks down for containerisation, and who handles reassembly.
2. Power and controls. Confirm local voltage and frequency; specify motor and control gear accordingly.
3. Wear parts and spares. Agree a critical spares list up front so first-year maintenance is not blocked by lead times.
4. Commissioning support. Clarify whether on-site guidance is included, and for how many days.
Our equipment has been exported to Southeast Asia, the Middle East, Africa and Central Asia across Belt & Road water projects, and we support shipment to your port with on-site guidance.